• Upgrading of Main Sewerage Treatment

    Contract No:M35
    Project Value:AED 775,000
    Client:ADSSC
    Consultant:KEO Internation
    Rawi MEP Scope:Vertical Turbine Pumps-75KW with 200mm dia Pipe Work XLPE/SWA/PVC Cabling
    Rawi Switchgear Scope:Form IV 2 x 75KW Soft Starter Motor Control Centre 200A TP Isolator Pump Remote Control Panel

  • Development of Plot C-1/Z-9, Sh. Mohammad City, Abu Dhabi

    Client:Link Investment
    Consultant:Bainona & Al Bayaty Architects
    Rawi MEP Scope:Street Lighting Works 12M, 6M, 5M Columns
    Rawi Switchgear Scope:Feeder Pillars in Aluminium Enclosures

  • H.H.Sheikh Issa Bin Zayed Palace

    Contract No:H54
    Project Value:AED 500,000
    Client:AlAin Municipal.
    Consultant:Maunsell
    Rawi MEP Scope:Irrigation Pumps, Pump Room Works, Instrumentation - Flowmeter, Flow Totalizer, Level Sensor, Salinity Sensor, Level Indicator associated works
    Rawi Switchgear Scope:Main LV Panel, 6 x 22KW Soft Starter Motor Control Centre Fountain Control Panels, Lighting Control Cabinets

  • Pumping Station

    Project Value:AED 275,000
    Client:AlAin Municipal.
    Consultant:AlAin Municipal.
    Rawi MEP Scope:Pressure Monitoring System, Ultrasonic Level Measuring System
    Rawi Switchgear Scope:600A ACB LV Panel 6 x 22KW Motor Control Centre

  • H.H.Sheikh Khalifa Farm, Gharaba

    Contract No:SAMIII
    Project Value:AED 900,000
    Client:Water & Electricity Dept., AlAin
    Consultant:Dr. Ahmed Abdul Warith
    Rawi MEP Scope:SCADA & Instrumentation 25 Wells Instrumentation - Flowmeter, Flow Totalizer, Ultrasonic Level Measuring System
    Rawi Switchgear Scope:25 nos. Wellhead Panels with RTU Main Remote Wellhead Console Remote Wellhead Console Irrigation Control Panel - 3 x 30KW Soft Starter PLC Control

  • Al Rowdah Palace

    Project Value:AED 575,000
    Client:Al Ain Municipal./ AbuDhabi Sewerage S.C
    Consultant:Maunsell
    Rawi MEP Scope:Sewerage Lifting Station Odour Control System NRV, Ultrasonic Level Measuring System, Backup Float Assembly, Basket Screen
    Rawi Switchgear Scope:Form 4 Motor Control Centre in GRP Kiosk 2 x 15KW Soft Starter

  • Infrastructure for Ramlat Al Raie Masoudi

    Project Value:AED 250,000
    Client:Al Ain Municipal./ AbuDhabi Sewerage S.C
    Consultant:Maunsell
    Rawi MEP Scope:Sewerage Lifting Station Odour Control System NRV, Ultrasonic Level Measuring System, Backup Float Assembly, Basket Screen
    Rawi Switchgear Scope:Form 4 Motor Control Centre in GRP Kiosk 2 x 2.6KW DOL Starter

  • Infrastructure for Ramlat Al Raie Bida Bint Saood

    Project Value:AED 350,000
    Client:Al Ain Municipal./ AbuDhabi Sewerage S.C
    Consultant:Maunsell
    Rawi MEP Scope:Sewerage Lifting Station Odour Control System NRV, Ultrasonic Level Measuring System, Backup Float Assembly, Basket Screen
    Rawi Switchgear Scope:Form 4 Motor Control Centre in GRP Kiosk 2 x 11.8KW Soft Starter

  • Construction of 2.5MG Reservoirs at Khabisi & Sarouj

    Contract No:N00-0007
    Project Value:AED 805,000
    Client:ADWEA
    Consultant:Maunsell
    Rawi MEP Scope:Ultrasonic Level Measuring System, Temperature, Condutivity, Backup Level Probes, Pressure Monitoring System, Ventilation System
    Rawi Switchgear Scope:Instrumentation Panel, Valve Actuators Panel, Main MIMIC Panel upgradation Ventilation Panel

  • Upgrading of Sarouj Pumping Station

    Contract No:N00-0007
    Project Value:AED 365,000
    Client:ADWEA
    Consultant:Maunsell
    Rawi MEP Scope:Addition of New 2 x 45KW & 2 x 15KW Soft Starters
    Rawi Switchgear Scope:Modification & addition of New Compartments for 2 nos. 45KW & 2 x 15KW Softstarters with PLC Automation

  • New Customer Relation Building

    Contract No:N00-0007
    Project Value:AED 1,375,000
    Client:ADWEA
    Consultant:Maunsell
    Rawi MEP Scope:3 nos. Chillers, Chilled Water Pumps, AHU, FAHU, Ventilation Fans, Extract Fans, Small Power & Lighting, Fire Alarm System, Data System, Lightning Protection System for Different Buildings
    Rawi Switchgear Scope:1500KVA Transformer LV Panel, Chillers Panel, Chilled Water Pump Control Chilled Water Pump Control

  • Upgrading of Military Pumping Station

    Contract No:N00-0007
    Project Value:AED 75,000
    Client:ADWEA
    Consultant:Maunsell
    Rawi MEP Scope:Addition of New 132KW Soft Starters
    Rawi Switchgear Scope:New 132KW Soft Starter in IP54 Sheet Steel Enclosure

  • Markhania Reservoir

    Contract No:N00-0007
    Project Value:AED 75,000
    Client:ADWEA
    Consultant:Maunsell
    Rawi MEP Scope:Valve Actuators Modification in MIMIC Panels

  • Reuse of Treated Final Effluent for Irrigation

    Contract No:M45/1
    Project Value:AED 4,500,000
    Client: Al Ain Municipal
    Consultant:Maunsell
    Rawi MEP Scope:SCADA - Radio Communication Flowmeters, Flow Control Valves, Pressure Transducers, Ultrasonic Level Measuring System Central Control Station with HMI
    Rawi Switchgear Scope:RTU Panels with Microprocessor Compressor Control Panel

  • City Centre - Jimi Station

    Contract No:H17
    Project Value:AED 720,000
    Client: Al Ain Municipal
    Consultant:Maunsell
    Rawi MEP Scope: Irrigation Pumps, Pump Room Instrumentation - Flowmeter, Flow Totalizer, Level Sensor, Salinity Sensor, Level Indicator associated works Valve Actuators, Extract Fans
    Rawi Switchgear Scope:Form IV 4 x 75KW Motor Control Centre

  • Towayya Pumping Station

    Contract No:H17
    Project Value:AED 720,000
    Client: Al Ain Municipal
    Consultant:Maunsell
    Rawi MEP Scope: Irrigation Pumps, Pump Room Instrumentation - Flowmeter, Flow Totalizer, Level Sensor, Salinity Sensor, Level Indicator associated works Valve Actuators, Extract Fans
    Rawi Switchgear Scope:Form IV 4 x 75KW Motor Control Centre

  • Zoo Pumping Station

    Contract No:H17
    Project Value:AED 720,000
    Client: Al Ain Municipal
    Consultant:Maunsell
    Rawi MEP Scope: Irrigation Pumps, Pump Room Instrumentation - Flowmeter, Flow Totalizer, Level Sensor, Salinity Sensor, Level Indicator associated works Valve Actuators, Extract Fans
    Rawi Switchgear Scope:Form IV 4 x 75KW Motor Control Centre

  • Town Centre

    Contract No:H17
    Project Value:AED 1,120,000
    Client: Al Ain Municipal
    Consultant:Maunsell
    Rawi MEP Scope: Irrigation Pumps, Pump Room Instrumentation - Flowmeter, Flow Totalizer, Level Sensor, Salinity Sensor, Level Indicator associated works Valve Actuators, Extract Fans
    Rawi Switchgear Scope:Form IV 4 x 75KW Motor Control Centre Variable Frequency Drive

  • Hili Pumping Station

    Contract No:H17
    Project Value:AED 720,000
    Client: Al Ain Municipal
    Consultant:Maunsell
    Rawi MEP Scope: Irrigation Pumps, Pump Room Instrumentation - Flowmeter, Flow Totalizer, Level Sensor, Salinity Sensor, Level Indicator associated works Valve Actuators, Extract Fans
    Rawi Switchgear Scope:Form IV 4 x 75KW Motor Control Centre

  • Sewerage Treatment

    Contract No:M4
    Project Value: AED 750,000
    Client: Al Ain Municipal.Sewerage Dept
    Consultant: Al Ain Municipal.Sewerage Dept
    Rawi MEP Scope: Vertical Turbine Pumps-75KW with 200mm dia Pipe Work XLPE/SWA/PVC Cabling 2 x 75KW Motor Control Centre 200A TP Isolator Pump Remote Control Panel
    Rawi Switchgear Scope:2 x 75KW Soft Starter Motor Control Centre 200A TP Isolator Pump Remote Control Panel

  • Additional Works

    Contract No:M35
    Project Value: AED 750,000
    Client: ADSSC
    Consultant:KEO Internation
    Rawi MEP Scope: Vertical Turbine Pumps-75KW with 200mm dia Pipe Work XLPE/SWA/PVC Cabling 2 x 75KW Motor Control Centre 200A TP Isolator Pump Remote Control Panel
    Rawi Switchgear Scope:Form IV 3 x 30KW Irrigation Control Panel, Lighting Panel Valve Actuator Panel

  • Water Supply to Liwa Hotel

    Project Value: AED 750,000
    Client: Public Works Dept., AUH
    Consultant:Public Works Dept.,Madina Zayed
    Rawi MEP Scope: Reservoir Lighting- 6M Poles Pump Room Works, Valve Actuators Panel
    Rawi Switchgear Scope:Form IV 3 x 30KW Irrigation Control Panel, Lighting Panel Valve Actuator Panel

  • Umm Ghafa Garden

    Contract No:H83
    Project Value: AED 750,000
    Client: Al Ain Municipal.
    Consultant:Maunsell
    Rawi MEP Scope: 8m poles - 100nos Irrigation Pumps, Pump Room Instrumentation - Flowmeter, Flow Totalizer, Level Sensor, Salinity Sensor, Level Indicator associated works
    Rawi Switchgear Scope:3 x 30KW Soft Starter Motor Control Centre 3 x 37KW Soft Starter Motor Control Centre

  • Defence Camp

    Contract No:H82
    Project Value: AED 300,000
    Client: Al Ain Municipal.
    Consultant:Maunsell
    Rawi MEP Scope: Irrigation Pumps, Pump Room Works, Instrumentation - Flowmeter, Flow Totalizer, Level Sensor, Salinity Sensor, Level Indicator associated works
    Rawi Switchgear Scope:3 x 22KW Soft Starter Motor Control Centre 3 x 37KW Soft Starter Motor Control Centre

  • H.H.Sheikh Ahmed Villa

    Contract No:H57
    Project Value: AED 600,000
    Client: Al Ain Municipal.
    Consultant: D. Balfour
    Rawi MEP Scope: Fountains, Garden Lights Pump Room, Fountain Pumps, Chemical Dosing Pumps, Garden Lights
    Rawi Switchgear Scope:Main LV Panel, Fountain Control Panel, Lighting Control Panel Extract Fans

  • Construction of Towayya Park

    Contract No:H3
    Project Value: AED 950,000
    Client: Al Ain Municipality Garden Sec.
    Consultant: Maunsell
    Rawi MEP Scope: Garden Lighting - 4m Poles, Projector Lights, Bollards Accomodation - Small Power & Lighting, Garden Lighting Instrumentation - Flowmeter, Flow Totalizer, Level Sensor, Salinity Sensor, Level Indicator
    Rawi Switchgear Scope:Main LV Panel Main LV Panel Lighting Control Panel

  • Al Ain International Airport

    Contract No: WED 6/69
    Project Value: AED 250,000
    Client: Al Ain Municipality Garden Sec.
    Consultant: Maunsell
    Rawi MEP Scope: Garden Lighting - Décor. Poles, Bollards, Spot Lights
    Rawi Switchgear Scope:Irrigation Control Panel, Lighting Control Panel

  • Water Supply Network to Sh. Khalifa Farm, Gharaba

    Contract No: WED 6/69
    Project Value: AED 1,255,000
    Client: Water & Electricity Dept.
    Consultant: Dr. Ahmed Abdul Warith
    Rawi MEP Scope: Form 4 MCC with ACB, Bus Coupler, RTU & PLC Control System Instrumentation - Flowmeter, Flow Totalizer, Level Sensor, Salinity Sensor, Level Indicator associated works
    Rawi Switchgear Scope:2 x 1000A ACB BUS COUPLER, FORM IV 4 x 110KW...

  • Greenhouse, Towayya

    Project Value: AED 1,255,000
    Client: Al Ain Municipal.
    Consultant: D. Balfour
    Rawi MEP Scope: SCADA, Central Climate Control Chilled Water Pumps, FCU, Screen Motor, Ventilation Motors, Humidity, Temperature Control
    Rawi Switchgear Scope:Chilled Water Pump Control Panel, RTU Panel, HVAC Panel

  • Greenhouse, Kuwaitat

    Project Value: AED 955,000
    Client: Al Ain Municipal.
    Consultant: D. Balfour
    Rawi MEP Scope: SCADA, Central Climate Control Chilled Water Pumps, FCU, Screen Motor, Ventilation Motors, Humidity, Temperature Control
    Rawi Switchgear Scope:Chilled Water Pump Control Panel, RTU Panel, HVAC Panel